Engineering And Science Building
-
Ceremony June 25 to recognize ESB, Eskind Library LEED Gold status
This 250,000-square-foot structure is home to both the Engineering and Science Building, which includes laboratories, classrooms and a state-of-the-art clean room, and Vanderbilt’s Innovation Pavilion, which includes the Wond’ry and its makerspace. (Daniel DuBois/Vanderbilt) Vanderbilt will be recognized for its sustainable building efforts on Tuesday, June 25, when… Read MoreJun. 20, 2019
-
Vanderbilt Engineering and Science Building wins international S-Lab Award
To enhance the undergraduate experience, the ESB puts science on display throughout the building, which features an open layout with large transparent glass walls. Above, a 10,000-square-foot, commercial-grade cleanroom for the Vanderbilt Institute of Nanoscale Science and Engineering. Engineering and Science Building Vanderbilt’s Engineering and Science Building has won… Read MoreJun. 3, 2019
-
Engineering and Science building recognized for green design
The Engineering and Science Building has been awarded gold LEED status by the U.S. Green Building Council. LEED or Leadership in Energy and Environmental Design, status is the rating system used to rank buildings of all types as certified, silver, gold or platinum based on the building’s environmental and… Read MoreJan. 18, 2019
-
Engineering and Science Building, Innovation Pavilion garner design awards
This 250,000-square-foot structure is home to both the Engineering and Science Building, which includes laboratories, classrooms and a state-of-the-art clean room, and Vanderbilt’s Innovation Pavilion, which includes the Wond’ry and its makerspace. (Daniel DuBois/Vanderbilt) Vanderbilt’s year-old Engineering and Science Building and Innovation Pavilion are garnering accolades from… Read MoreAug. 28, 2017
-
Grand Stair dedicated in honor of alumni Ed and Sue Clark
Vanderbilt alumni Ed and Sue Clark, third and fourth from left, are surrounded by their children and grandchildren at the April 28 dedication of the Ed and Sue Clark Grand Stair, the architectural focal point of the new Engineering and Science Building and Innovation Pavilion. (Alan Poizner/Vanderbilt) The striking spiral… Read MoreMay. 4, 2017
-
Vanderbilt’s innovation space – Wond’ry – hosts grand opening
Vanderbilt University’s new cross-disciplinary innovation space, the Wond’ry, will host an open house as part of its grand opening celebration between 3 and 5 p.m. on Wednesday, Nov. 9. Student ambassadors, Vanderbilt faculty and Wond’ry staff will lead tours of the new 13,000-square-foot space, located… Read MoreNov. 3, 2016
-
Vanderbilt launches the Wond’ry at its new Innovation Pavilion
Vanderbilt University has opened a new cross-disciplinary creative space called the Wond’ry that is the centerpiece of the Innovation Pavilion announced last year as part of the continued implementation of the university’s Academic Strategic Plan. “Universities, at… Read MoreSep. 22, 2016
-
Engineering school builds bridge to local, state maker communities
Vanderbilt University School of Engineering added another pillar to the bridge it’s building to the maker community in Nashville and beyond. The school’s daylong ” Design, Build and Test (DEBUT) Makerspace Planning Workshop” Dec. 11 attracted well over 100 registrants who were interested in previously announced plans for a 13,000-square-foot… Read MoreDec. 22, 2015
-
Innovation Center to support campus ‘makers’; search underway for director
A rendering of the Engineering and Science Building, home to the newly announced Innovation Center. (Vanderbilt University) A new Innovation Center is being developed on the Vanderbilt University campus to support a “maker” culture that will encourage entrepreneurship and creativity and bolster implementation of the university’s… Read MoreAug. 6, 2015
-
Blast signals excavation at site of new Engineering and Science Building
Engineering Dean Philippe Fauchet ceremoniously signals the beginning of excavation at the site of the new Engineering and Science Building with a 3-2-1 countdown to the blast foreman. The university marked a milestone September 17 when blasting began at the construction site for its new seven-story 230,000-square-foot Engineering and Science… Read MoreSep. 25, 2014